User Tools

Site Tools


gsoc:2019-gsoc-safety-critical-linux

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
gsoc:2019-gsoc-safety-critical-linux [2019/01/24 12:12]
lukas.bulwahn
gsoc:2019-gsoc-safety-critical-linux [2019/01/24 12:14]
lukas.bulwahn
Line 11: Line 11:
 The Google Summer of Code Projects are activities that contribute to those two fields of work. The Google Summer of Code Projects are activities that contribute to those two fields of work.
  
-Primary mentoring contacts: Lukas Bulwahn, lukas.bulwahn at gmail.comJulia Lawall ​<julia.lawall@lip6.fr>, Nicholas Mc Guire, der.herr at hofr.atRalf Ramsauer+Primary mentoring contacts: Lukas Bulwahn, lukas.bulwahn at gmail.comJulia Lawalljulia.lawall ​at lip6.frNicholas Mc Guire, der.herr at hofr.atRalf Ramsauer, ralf.ramsauer at oth-regensburg.de
  
 ==== Some background on previous activities in safety-critical systems ==== ==== Some background on previous activities in safety-critical systems ====
Line 47: Line 47:
 The issue tracker, https://​github.com/​lfd/​PaStA/​issues,​ provides a good overview of possible student activities in a GSoC project related to PaStA. A student start look into those issues and determine a suitable selection of tasks and goals from that issue tracker that can be handled within the timeframe of the GSoC project. A project proposal should breakdown the goals stated in the issue tracker to a more detailed plan of activities, needed extensions of PaStA and the implementation tasks. ​ The issue tracker, https://​github.com/​lfd/​PaStA/​issues,​ provides a good overview of possible student activities in a GSoC project related to PaStA. A student start look into those issues and determine a suitable selection of tasks and goals from that issue tracker that can be handled within the timeframe of the GSoC project. A project proposal should breakdown the goals stated in the issue tracker to a more detailed plan of activities, needed extensions of PaStA and the implementation tasks. ​
  
-Main contact person for this project proposal: Ralf Ramsauer+Main contact person for this project proposal: Ralf Ramsauer, ralf.ramsauer at oth-regensburg.de
  
 ==== Handling Complex Types and Attributes in Coccinelle ==== ==== Handling Complex Types and Attributes in Coccinelle ====
Line 57: Line 57:
 This project is relevant to Linux, Zephyr and many more applications. This project is relevant to Linux, Zephyr and many more applications.
  
-Main contact person for this project proposal: Julia Lawall ​<julia.lawall@lip6.fr>+Main contact person for this project proposal: Julia Lawalljulia.lawall ​at lip6.fr
  
 ==== Develop Methods for Tracking Tool Analysis Findings over Time ==== ==== Develop Methods for Tracking Tool Analysis Findings over Time ====
gsoc/2019-gsoc-safety-critical-linux.txt ยท Last modified: 2019/03/04 12:53 by lukas.bulwahn